Linnel Precision Engineering
Jan 29, 2019 | Case Study
Customer | Linnel Precision Engineering |
Sector | Industrial |
Building Usage | Engineering Shop |
Client | End user |
Location | St Johnstone Scotland |
Architect/Project | Linnel Precision Engineering |

We had previously supplied our client with a building, however due to continued expansion, we were asked to reposition and extend the previous building and then build a new separate structure 19m x 33m x 6m to the eaves. The contract was completed within an 8 week period and to the customer’s satisfaction.
 |