We were approached directly by the end user of the building who had very specific requirements; the client had not embarked on a project of this nature before and required much help and advice to ensure that the building met with his criteria. Our groundwork & building package ticked the clients boxes we designed & constructed a concrete raft to meet the heavy usage of the floor and supplied 15m x 30m x 5m to the eaves building with 3 rollershutter doors, and clad using a single skin sheet and an anti-condensation barrier on the roof sheets. This project was completed within a 6 week window.