Midbrook Steel Buildings were instructed by a large religious organisation to carry out two significant buildings for their new headquarters in the South of England. Midbrook’s expertise in delivering a quick economical construction method was demonstrated in full on this project.

Working within a tight timescale, the Midbrook team had a major impact on the design elements to ensure the buildings met our clients requirements. The project consisted of a reinforced insulated raft foundation, prepared and concreted within a month and two portal cold rolled steel frames, erected, cladded and fitted with aluminium windows and doors all within a month.