Case Studies

Storage – Exeter

Storage – Exeter

SectorWholesalers
Building UsageStorage & Office Space
LocationExeter
Architect/ProjectMidbrook Design
what we did...
Midbrook were contracted to carry out the initial planning work for our client on this project, groundworks including drainage and additional yard area. Insulated cladding, fire boundary treatment and all supply and fitting of aluminium windows all formed part of the package.

Click here for a quote
Biomass Plant Room – Goole

Biomass Plant Room – Goole

SectorPharmaceuticals
Building UsageBiomass Plant Room
LocationGoole
Architect/ProjectClient Led
what we did...
To supply & fit a mono pitch design insulated steel frame building with openings created for necessary pipework, including double door.

Click here for a quote
Parts Storage – North London

Parts Storage – North London

SectorAutomotive
Building UsageParts Storage
LocationNorth London
Architect/ProjectClient Led
what we did...
We were instructed to find a solution to maximise the space of this site by way of a mono pitch extension. We were contracted to supply structural steelwork & design and insulated cladding.

Click here for a quote
Offices – Telford

Offices – Telford

SectorRetail
Building UsageOffices & Warehousing/Trade Counter
LocationTelford
Architect/ProjectMidbrook Design
what we did...
Midbrook were appointed to carry out the planning, groundworks & drainage, steelwork, cladding and aluminium windows on this project. Building dimensions were 15m x 30m with an eaves height of just over 6m.

Click here for a quote
Production – Industrial

Production – Industrial

SectorIndustrial
Building UsageProduction
LocationWigan
Architect/ProjectMidbrook Design
what we did...
Midbrook were employed to carry out the construction of a reinforced concrete slab and additional roadway and drainage works. The building dimensions were 11m x 30m with an eaves height of 6m, clad with insulated panels. Additional re-cladding works were carried out to other buildings on the site as part of the project.

Click here for a quote
Chemical Storage

Chemical Storage

SectorChemical
Building UsageChemical Storage & Offices
LocationCambridge
Architect/ProjectClient Led
what we did...
Our brief was to supply a complete package, including, groundworks & drainage, mezzanine, flooring, handrails and escape stairs, insulated cladding and rollers utter door.

Click here for a quote
Holiday Park Clubhouse

Holiday Park Clubhouse

CustomerHoliday Park
SectorLeisure
Building UsageHoliday Park Clubhouse
LocationSouth East Coast
Architect/ProjectClient Led
what we did...
Supply a galvanised cold rolled steel frame with a hot rolled propped portal, approx. dimensions 0f 34m x 60 m and 25m x 29m with an eaves height of 3.2m, designed and engineered by Midbrook. Insulated anthracite cladding supplied and fixed horizontally on the sides.

Click here for a quote
Middleton Railway

Middleton Railway

CustomerMiddleton Railway
SectorRail
Building UsageTrain Storage
ClientMiddleton Railway
LocationLeeds
Architect/ProjectMidbrook Design
what we did...
Supply groundworks and building package for charitable trust, single skin sheeting open sided on one side, eaves height 4.5m.

Click here for a quote
Village Hall

Village Hall

CustomerVillage Hall, Peldon
SectorCommunity
Building UsageRecreational
ClientEnd User
LocationPeldon
Architect/ProjectNot applicable
what we did...
Our broad range of building uses is demonstrated with the erection of the structural steelwork for a new village hall facility in Peldon. The Steelwork has been erected within in a week, with Roof cladding and brickwork to follow.

Click here for a quote
Target Statical

Target Statical

CustomerTarget Statical
SectorN/A
Building UsageOffices & Material Store
ClientTarget Statical
Architect/ProjectUnknown
what we did...
Following our initial site survey our client opted to take advantage of our quotation to carry out the groundworks and to supply and fit the building. This building was offered with a horizontal shiplap cladding. Midbrook Steel Buildings were contracted to carry out the supply and fit of the main frame and roof and wall cladding, whilst the internal work was carried out by others.

Click here for a quote