Customer | Cambridge Biopower Ltd |
Sector | Commercial |
Building Usage | Storage |
Location | Peterborough |
Architect/Project | Midbrook Design Team |

“Need a building quickly?”
We recently supplied and fitted this steel framed building (9m x 20m x 5m to eaves) for Cambridge Biomass within 4 weeks from the initial enquiry.
Our robust galvanised steel frame can bolt directly down to a concrete slab, and with good access and safe working conditions the building was erected within a week.
 |